一、前言新安江工程在技术經济报告阶段,选擇了銅官坝段作为本工程最适宜的坝址区,并把銅官下游約4公里的罗桐埠坝段作为付区。1955年春,初步設計阶段地質勘探的初步結果,証明罗桐埠坝段河床有紫色頁岩,岩心很破碎,左岸岸坡的宽大破碎帶可能影响到河底,肯定罗桐埠坝段不如銅官坝段,决定集中力量对铜官坝段进行初步设计阶段的勘測设计工作。铜官坝段在浙江省建德县境,河谷为近南北方向,新安江由北向南流經峽谷,峡谷全長約800公尺,其上下游都有較开阔的台地。河底高程在20公尺左右,靠左岸的一半河床,水下地形較平緩,仅有1—
Foreword Xin’anjiang project in the technical and economic reporting stage, selected Tongguan dam as the most suitable dam site area, and Tongguan downstream about 4 km Luo Tongbu dam section as a pay zone. In the spring of 1955, preliminary results of geological exploration in the preliminary design stage proved that there were purple shale in the bed of the dam section of the Luotong port, the core was very broken, and the large broken belt on the left bank slope might affect the bottom of the river. It is certain that the Luo Tong Bu section is not as good as the Tongguan dam Paragraph, decided to concentrate on Tongguan dam section of the preliminary design stage of the survey and design work. Tongguan dam section in Jiande County, Zhejiang Province, the valley is near the north and south directions, Xinanjiang from north to south through the canyon, gorge about 800 meters in length, both upstream and downstream have more open platform. River bottom elevation of 20 meters, on the left bank of half of the river bed, the water is relatively flat terrain, only 1-