炼厂转炉炉后捅风眼,自建厂以来一直采用人工操作。每台炉需操作工5人,不仅劳动强度大,而且炉后高温、粉尘、烟害给操作带来很大困难。为改善操作条件,解放劳动力,满足生产发展的需要,69年,开始试制捅风眼机。以老工人为主体的三结合试验攻关小组,在厂党委正确领导下,在全厂职工和兄弟单位大力支持下,多年来,克服种种困难,不断摸
After the refinery converter stove stab eye, since the construction has been using manual operation. Each furnace requires 5 operators, not only labor-intensive, and high temperature after the furnace, dust, smoke harm to the operation of great difficulties. In order to improve operating conditions, liberate the labor force and meet the needs of production and development, 69 years have begun to trial production of wind-driven machines. Over the years, with the correct leadership of the factory party committees and the vigorous support of the entire factory workers and fraternal units, the three-in-one joint research team with old workers as the main body has overcome many difficulties and constantly touched