论文部分内容阅读
一、丰满水力枢纽工程运行概况丰满水力枢纽位于第二松花江中游、距吉林市24km,控制流域面积42,500km~2,占第二松花江流域面积的55%,占哈尔滨以上松花江流域面积的11%。丰满大坝的防洪标准是按p=0.1%洪水设计,p=0.01%洪水校核。下游河道堤防按丰满迂P=1%洪水时,放流量为5.500m~3/s进行设计的。在迂p=0.1%及以上洪水时,按“丰满大坝安全第一、哈
1. Fengman hydropower project operation profile Fengman hydropower hub located in the middle reaches of the second Songhua River, from Jilin City, 24km, control basin area of 42,500km ~ 2, accounting for 55% of the second Songhua River basin area, accounting for the area of Harbin Songhua River basin 11%. Flood control standards for Fengman Dam are designed for floods with p = 0.1% and p = 0.01% for flood checking. Downstream river embankment according to the fullness of detours P = 1% of the flood, the discharge of 5.500m ~ 3 / s design. In the bypass p = 0.1% and above the flood, press "plump dam safety first, ha