论文部分内容阅读
应用动态规划的理论模型,并结合具体原条进行优化设计,从而得最优的造材方案和原木的最高售价。
Application of dynamic programming theory model, combined with the specific original article to optimize the design, so as to get the best timber project and the highest price of logs.