论文部分内容阅读
随着建设事业的蓬勃发展,公路建设领域取得了很多成就,公路建设施工技术也得到了相当程度的提高。然而在我国大西北的戈壁滩和沙漠地区,公路建设还存在很多的技术难点和困难,其中风积沙路堤施工是我们进行戈壁津和沙漠地区公路建设中无法回避的一种路堤结构形式。本文根据2002年曾经在内蒙古地区参加的阿拉善蒙右旗巴(彦诺尔公)-额(肯呼都格)二级公路S307线的风积沙路堤压实施工技术为研究对象,分别介绍了填料、填筑、压实技术等路堤施工的一般技术要求,并对风积沙路堤施工工艺过程中的技术进行了详细介绍,希望能够对相关领域的研究起到抛砖引玉的作用。
With the rapid development of construction, many achievements have been made in the field of highway construction, and the construction technology of highway construction has also been greatly improved. However, there are still many technical difficulties and difficulties in road construction in the Gobi Desert and the desert areas in the northwest of our country. Among them, embankment construction with aeolian sand is an unavoidable embankment structure in highway construction in the Gobi Desert and the desert region. According to the compaction technology of aeolian sand embankment on the S307 line of the second grade highway of Alashan Meng Youyi Banner (Yannuoergong) - Ke’enghu grid in Inner Mongolia in 2002, this paper introduces Filling, filling, compaction technology embankment construction of the general technical requirements, and the Aeolus sand embankment construction process technology in detail, hoping to play a valuable role in the study of related fields.