一、电站基本概况太平哨电站是浑江于流中下游梯级的第三级电站,混合式开发,具有日调节性能.电站开发的主要任务是发电,装四台HL240-LH-410型水轮发电机组,铭牌出力18万千瓦,设计条件下的容量为16.1万千瓦。电站保证出力2.5万千瓦,多年平均发电量4.3亿度。据东北电力系统十年规划安排,太平哨水电站宜担任工作容量12万千瓦,备用4万千瓦。
First, the basic situation of power station Taiping Sentinel power station is the third stage hydropower station in the middle and lower reaches of the Hunjiang River flow, hybrid development, with day-regulation performance. The main task of power station development is power generation, equipped with four sets of HL240-LH-410 Generators, nameplate output 180,000 kilowatts, the design capacity of 161,000 kilowatts. Power station to ensure output of 25,000 kilowatts, for many years the average generating capacity of 430 million degrees. According to the planning of the Northeast Power System for ten years, Taiping Whistle Hydropower Station should serve as a working capacity of 120,000 kilowatts, standby 40,000 kilowatts.