立井延深中井筒砌壁所需混凝土大多采用井下拌制 ,混凝土质量不易保证 ,工人劳动强度大 ,工作效率难以提高 ,且受井下环境限制 ;同时 ,给矿井提升带来压力。新集三矿在风井延深工程中 ,由地面施工混凝土下料孔 ,混凝土搅拌站设在地面 ,拌制好的混凝土经下料孔直接溜至延深辅助水平 ,再转入井筒内溜灰管入模。风井延深工程采用该混凝土输送方式取得了良好效果。
Most of the concrete required for vertical wellbore wall construction in vertical shaft is prepared by downhole mixing. The quality of concrete is not easy to guarantee. The labor intensity of workers is high, the working efficiency is hard to be improved, and the environment is limited by underground environment. At the same time, the pressure is brought to improve the mine shaft. New set of three mines in the shaft deepening project, the ground by the construction of concrete cutting holes, concrete mixing station located on the ground, mixing concrete through the feed hole directly slipped to the depth of the auxiliary level, and then into the wellbore slip ash Pipe into the mold. Air well extension project using the concrete delivery has achieved good results.