论文部分内容阅读
阿姆斯德格 (Amsteg)电站的改建工程是瑞士在建的最大、最复杂的施工项目 ,除重建一套完整的水力系统外 ,其规划还包括了一座新的地下厂房洞室 ,它是瑞士土石方开挖量最大的工程之一。本文对新厂房的设计和施工作一概述。(洞室的长轴要与岩层成正交 ) ; ·不同的阶段
The reconstruction of the Amsteg power station is the largest and most complex construction under construction in Switzerland. In addition to the reconstruction of a complete hydraulic system, the plan includes a new underground powerhouse, One of the largest earth excavations in Switzerland. This article gives an overview of the design and construction of the new plant. (The long axis of the cavern should be orthogonal to the rock formation.) • Different stages