论文部分内容阅读
“列车驼峰解体显示系统”研究项目已于1993年11月通过铁路局的技术鉴定。该系统适应运输生产需要,在编组站驼峰平台设置大型显示屏,与“微机控制调车作业通知单传送系统”联机运行。在列车推峰解体作业过程中,屏幕钩计划显示与驼峰提钩作业基本同步,提示驼峰作业人员准确提钩,防止错误。整个系统主要由:主机、提钩显示屏和车组动态采样电路三部分组成。特点为:1、
“Train hump disintegration display system ” research project passed the technical appraisal of the Railway Bureau in November 1993. The system adapts to the needs of transportation and production, and sets up a large display screen at the hump platform of the marshalling yard to run online with the “Computer Control Shunting Operation Notice Transmission System”. In the process of pushing peak disintegration train operation, the screen hook program shows the basic synchronization with the hump mentioning hook operation, prompts the hump operator to mention the correct hook, to prevent errors. The whole system mainly consists of: host, mention hook display and dynamic sampling circuit unit composed of three parts. Features are: 1,