论文部分内容阅读
本文介绍的是采用大量崩矿法回采坑内矿柱的设计、采准和回采。为了实现持续改进生产过程的长期目标,对汤普森(Thompson)矿所有的上向分层充填和下向分层充填采区改造成称之为垂直矿块采矿法(VBM)的大量崩矿法的可能性作了评价。
This article describes the use of a large number of mine collapse pits pits mining design, mining and mining. In order to achieve the long-term goal of continuous improvement in the manufacturing process, all up-gradation and down-stratification of the Thompson mine has been transformed into a number of collapse processes known as vertical block mining (VBM) The possibility was evaluated.