问:我是建设单位代表,施工单位浇筑的混凝土配合比有问题,试件不合格,取芯检测不合格。现在办公楼二层99%的现浇板上表面开裂,板底同样开裂。25日下了场雨,26日二层现浇板大范围沿裂缝漏水,此时三层梁板混凝土已经浇筑,雨水是从外面飘进来的(图1)。
Q: I am the representative of the construction unit. There is a problem with the mix proportion of the concrete poured by the construction unit, the test piece is unqualified and the coring test is unqualified. Now 99% of the second floor of the office building slab on the surface cracking, the same cracking the same bottom. On the 25th under the rain, a large area on the 26th floor cast-in-place cracks along the leaking water, this time three-layer concrete beams have been pouring, rain drifted in from the outside (Figure 1).