Beijing Radioactive Ion-beam Facilities (BRIF) project is in progress. The preliminary engineering design of BRIF has been finished. The working drawing design
The Neutron Wall(NW)is one of the key detectors for the external target experiment of CSRm. There are 36 scintillator units and 216 sampling calorimeter units w
With multi-particle tracking code COMA, the process of accelerating for CYCIAE-100 is simulated and the beam dynamics such as the energy spread, phase slip, emi