流溪河水电站的爆破队伍,是在古田水电站开挖中培养起来的。由最初七人組成的一个放炮組,不断增加到70多人。来流溪河后对新参加工作的30多人,进行了一月爆破工作的基本原理及爆破工作安全技术規程的学習,經考試合格。在实际操作中,由具有数年爆破工作經驗的工人負責領导。78名爆破人員中,四級工以上的計19人,三級的20人,一般的都是四級工才能掌握一个工作面的爆破工作。对新参加工作的人員,不允許單独操作,在实际操作小采用配备助手的方法帶徒弟缱芭谑?助手傳遞,炮工裝炮。在电气爆破时測量綫路电阻工作,也由一个老炮手带
The blasting team of Liuxihe Hydropower Station was cultivated in the excavation of Gutian Hydropower Station. A blasting group composed of the first seven people has continuously increased to more than 70. After coming to Liuxihe, more than 30 new personnel participated in the work. They conducted the basic principles of blasting work in January and the safety technical regulations of blasting work, and passed the examination. In practice, workers with several years of blasting experience are responsible for the leadership. 78 blasting personnel, more than four workers accounted for 19 people, three people in 20, are generally four workers to master a face blasting work. For new personnel to participate in the work, not allowed to operate alone, in the practical use of a small way with aides with apprentice Bajiao? Assistants pass, artillery artillery. Measuring electrical resistance at the time of electrical blasting work, also by an old gunner belt