论文部分内容阅读
冶金部矿山司和尾矿坝工程安全技术监督站于1989年5月10日至13日共同在马钢南山铁矿召开了1989年冶金矿山尾矿库防汛工作会。参加会议的有全国冶金重点铁矿、重点辅助原料矿山、部分中型骨干铁矿和有关设计、研究单位的代表共83人。会上,矿山司生产处傅青春处长总结了去年以来冶金矿山尾矿库防汛工作情况,对做好今年尾矿库防汛工作提出了具体要求。监督站栾永超副站长作了近一年的工作情况报告。江苏冶山铁矿、福建潘洛铁矿、武钢太冶铁矿3个
Metallurgical Division and Tailing dam mine safety engineering supervision station in May 10, 1989 to 13 jointly held in Masteel Nanshan Iron Mine Mine Metallurgical Tailings Flood Control 1989 meeting. Attending the meeting were key metallurgical iron mines in the country, key auxiliary raw materials mines, some medium-sized backbone iron mines and representatives of relevant design and research institutes with a total of 83 participants. At the meeting, Mr. Fu Qingchun, director of Production Department of Mine Division, summarized the flood control work of tailings ponds of metallurgical mines since last year and put forward specific requirements for flood control work of tailings ponds this year. Luan Yongchao, deputy director of supervision station made nearly a year’s work report. Jiangsu Ye Shan Iron Mine, Fujian Panluo Iron Ore, Iron and Steel Taiyuan Iron Ore 3