论文部分内容阅读
冶金建筑学会施工技术学会于1988年6月3日至6日在上海召开了理事会和进行了施工技术交流。会议代表为来自各冶金建设公司的建筑施工的技术负责人以及大专院校、科研单位的科技工作者。会议收到20多篇论文,并在大会上进行了交流,内容反映了目前冶金建设工程中的最新施工技术。如二十冶的多次压力注浆式土锚杆在饱和软粘土工程中的应用;目前国内最深的、宝冶的热轧铁皮坑50m地下连续墙施工;三冶的粘接钢板补强加固新技术;十八冶老厂改造成套技术;五冶的环氧树脂灌浆混凝土构件裂缝;西安
The Construction Technology Association of the Metallurgical Association of Architects held a board meeting in Shanghai from June 3rd to June 6th, 1988 and conducted construction technology exchanges. Representatives of the conference are technical leaders from construction companies of various metallurgical construction companies, as well as science and technology workers from universities and research institutes. More than 20 papers were received at the conference and exchanged at the conference. The contents reflected the latest construction technology in the current metallurgical construction project. For example, the application of multiple pressure grouting type soil anchor rods of 20Ye in the saturated soft clay project; the 50m underground continuous wall construction of the hot-rolled iron pit in Baosteel, the deepest in China, and the reinforcement and reinforcement of bonding steel plates in Sanye New technology; 18 yeye old factory transformation complete set of technology; Wuye’s epoxy resin grouting concrete component crack; Xi’an