南非德比尔斯公司芬斯克金刚石矿于1988年下半年首次就铲运机监测和调度系统与 Modular 公司进行了接触,Modular 公司当时拒绝了正式报价的要求,但同意进行工程可行性研究。1989年年中提交了研究报告,这使芬斯克矿相信利用当时成熟的技术可以开发出地下调度系统。1990年双方签订了这种系统的开发合同,1991年5月,系统建成开始运行。至1991年年底,该矿两个生产阶段上作业的铲运机都是通过这一系统来控制的。
For the first time in the second half of 1988, the Fensker diamond mine at De Beers, South Africa, had contacted Modular, which rejected the offer but agreed to conduct a feasibility study for the project. A study was submitted in mid-1989, which convinced the Finske Mine to develop a subsurface dispatch system using well-established techniques at that time. In 1990 the two sides signed a contract for the development of such a system. In May 1991, the system was put into operation. By the end of 1991, the scraper operated on both stages of the mine had been controlled through this system.