论文部分内容阅读
水电站厂房尾水管杆件截面尺寸较大,按弹性地基上的框架进行内力计算,并考虑节点刚域的影响,进行断面及配筋设计。
The section size of the draft tube rod of the hydropower station is larger, the internal force is calculated according to the frame on the elastic foundation, and the cross-section and reinforcement design are taken into consideration considering the influence of the rigid zone of the node.