论文部分内容阅读
本文介绍了鄂钢焦化厂制冷及干熄焦循环水系统的现状,针对供水方面存在的问题进行了分析和探讨,提出了整改建议,以满足制冷机开机及干熄焦汽轮机组并网发电的生产要求。
This paper introduces the current situation of the refrigeration and CDQ circulating water system in the E & C Coking Plant, analyzes and discusses the problems existing in the water supply, and puts forward the rectification and reform proposals to meet the requirements of the start-up of the refrigerator and the co-generation of CDQ turbine units Production requirements.