论文部分内容阅读
由我公司、重庆大学共同为南川金佛山电厂研制开发的 YFSW2500-6/1180型2500kW 异步水轮发电机于1997年4月11日在德阳市通过了由四川省科委主持的技术鉴定。1994年5月1日,2500kW 异步水轮发电机一次在南川金佛山电厂并网成功,满负荷安全可靠运行至今。与同步发电机比较,该机具有效率高、投资省、实施简便、运行经济、安全可靠和操作维护方便、吸收无功等
The YFSW2500-6/1180 2500kW asynchronous hydro-generator developed by our company and Chongqing University for the Nanchuan Jinfo Electric Power Plant passed the technical appraisal hosted by the Sichuan Provincial Science and Technology Commission on April 11, 1997 in Deyang City. On May 1, 1994, the 2500kW asynchronous hydro-generator was successfully connected to the grid in Nanchuan Jinfo Electric Power Plant once, and it has been safely and reliably operated at full load. Compared with synchronous generators, this machine has high efficiency, low investment, easy implementation, economical operation, safety and reliability, convenient operation and maintenance, and absorption and reactive power.