桂坑一级水电站建于1989年十月,本次由于该水电站进行技术改造需复核确定水电站的装机容量。本文介绍“运用装机容量年利用小时数法确定水电站的装机容量”的方法来解决这一问题。
Gui Keng a hydropower station was built in October 1989, due to the technical transformation of the hydropower station to be verified to determine the hydropower installed capacity. This article describes how to solve this problem by using the method of using the annual installed capacity to determine the installed capacity of hydropower stations.