【摘 要】
:
一、应该装用单机出力 尽可能大的水轮机 三峡水利工程是长江流域最为关键的水力枢纽,控制着长江下游五省的洪涝和上、下游的航运,早晚必须兴建。按长江流域的规划,它的设计
论文部分内容阅读
一、应该装用单机出力 尽可能大的水轮机 三峡水利工程是长江流域最为关键的水力枢纽,控制着长江下游五省的洪涝和上、下游的航运,早晚必须兴建。按长江流域的规划,它的设计水头H=110~130米。总装机容量ΣN=2500~3000万千瓦,是世界最大的水电站。葛洲坝水电站
First, turbines should be installed as large as possible. The Three Gorges Project is the most crucial hydraulic hub in the Yangtze River basin. It controls the floods in the five lower reaches of the Yangtze River and the upper and lower shipping lines and must be built sooner or later. According to the planning of the Yangtze River Basin, its design head H = 110 ~ 130 meters. The total installed capacity ΣN = 2500 ~ 30 million kilowatts, is the world’s largest hydropower station. Gezhouba Hydropower Station
其他文献
一些汽车及其它机车的使用说明书上有这样一段文字说明:在发动机启动后,必须立即放松点火开关的钥匙,使钥匙由启动位置迅速回复到点火位置,否则将损坏启动机等。其原因是此类
Until recently main attention was given to the quality methods of the earthquakeprediction.“Anomalies”were selected,which were then connected with known seism
目的观察CIK(cytokine induced killer)细胞对S180和H-22荷瘤鼠的抑制肿瘤作用。方法建立S180和H-22荷瘤鼠动物模型,静脉输入CIK细胞做抗肿瘤治疗,同时设LAK对照,用同位素法
一、确保荆江大堤的重大意义荆江区西自枝江、东抵域陵矶、南接洞庭湖区,北隣荆江区;长江干流曲折流经该区,这段长江号称荆江,全长423公里,藕池口以上称上荆江,以下称下荆江
利用激光诱导与化学镀铜的方法在聚酰亚胺薄膜上制备了太赫兹线栅偏振器和带阻滤波器,用太赫兹时域光谱系统对所制备的器件进行了测试。测试结果表明,该方法制备的太赫兹线栅
2 ,2’ ,7,7’-四碘-9,9’-螺二芴具有特殊的螺形结构 ,它是合成空穴导电材料OMeTAD和TAD及其它一些导电高分子的关键中间体 .我们发展了一种条件温和简便的方法 ,高产率地合
一、现河道有很大的排洪能力,据计算,现大堤花园口至孙口河段设防水位下可泄流量四万一千至二万二千秒立米,位山以下除利津附近外可泄流量一万二千秒立米左右,经过改造后还
本文为长江流域規划办公室林一山主任在长办举行的欢迎华东水利学院同学們的欢迎会上的講話,原載“人民长江”1959年第5期,因文中着重討論了水文水利計算的研究方向問题,故特
随着经济飞速发展,财务会计的使用越来越广。本文就职业学校的财务管理教学现状进行分析,提出一些教学方法,以促进财务管理教学质量。
With the rapid economic development
达喀尔烽烟再起,长城汽车战绩不俗,达喀尔这块试金石已经把长城汽车磨砺得愈发灿烂夺目。又上征途秘鲁当地时间1月5日(北京时间1月6日凌晨),2013年达喀尔拉力赛首战结束。哈