三峡左岸电站14台机组采用国际招标。招标文件规定,水轮机转轮的加工精度按国际通用标准IEC193-1977来验收。在议评标阶段,业主把握了投标商的竞争心态,适时提出由各投标商自报水轮机转轮的加工精度,并以此作为评价其工艺水平的依据之一。决标的结果是中标厂商的承诺普遍高于IEC193-1977标准,即三峡水轮机的制造精度将是高水平的。
Three units of the left bank power plant 14 international bidding. Bidding documents, turbine wheel machining accuracy according to international standards IEC193-1977 to acceptance. During the bid evaluation stage, the owner grasped the competition mentality of the bidder, timely put forward the self-reported machining accuracy of the turbine runner by each bidder, and used it as one of the bases for evaluating the technological level of the bidder. The result of the bid decision is that the bidder’s promises are generally higher than the IEC193-1977 standard, that is, the manufacturing precision of the Three Gorges turbine will be high.