用大系统递阶控制理论进行跨流域水电站群的补偿调节

来源 :成都科技大学学报 | 被引量 : 0次 | 上传用户:Rosa1201
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
本文根据水电系统规划阶段的特点,建立了跨流域水电站群补偿调节优化的数学模型,并运用大系统递阶最优及控制中的分解——协调理论,将原来的高维问题分解为一系列独立的低维子问题,用逐步优化方法逐一求解,然后采用常用的梯度协调法协调主、子问题,从而达到总体最优。文中已给出实例,验证了该法的可行性,并得到了较为满意的结果。 According to the characteristics of the hydropower system planning stage, this paper established a mathematical model of hydropower station inter-basin hydropower station compensation adjustment and optimization, and applied the theory of large-scale system-level optimization and decomposition-coordination theory in control to decompose the original high-dimensional problems into a series of The independent low-dimensional sub-problems are solved step by step by step, and then the commonly used gradient coordination method is used to coordinate the main and sub-problems so as to achieve the overall optimality. An example has been given in the paper, which verifies the feasibility of the method and obtains more satisfactory results.
其他文献
随着我国高等教育的快速发展和全民素质的不断提高,高等职业教育迎来了空前的发展机遇,学校数量增加,招生规模扩大。但随之而来的一个问题是入学新生数学总体水平明显下降,水
飞来峡水利枢纽工程,位于北江干流清远县境内,设计正常蓄水位24.0m(珠基)。按规范,移民搬迁采用20年一遇洪水回水加发电回水外包线,土地淹没采用5年一遇洪水回水加发电回水
出水口是低压管道输水灌溉系统的末级建筑物,其形式和性能的优劣,将直接影响整个灌溉系统的使用效果。升降式出水口是利用低水头压力,克服升降竖管的自重、升降竖管与套管之
随着旅游业的发展,越来越多的人喜欢出国旅游,体味不一样的异国风情。在进行外国景点的介绍时,必须要对景点有一个准确的翻译。文章将从生态翻译学的角度出发,对现在的国际景
在温度 1 2 .1~ 60 .5℃范围内测定了地下卤水体系的饱和蒸汽压 ,并采用Clausius -Clapeyron方程进行关联 ,计算水活度 ;比较强电解质混合体系水活度的理论计算模型 ,探索计算
文化差异会影响到第二语言教学,因此语言教学必须与文化教学相结合。汉语作为第二语言教学的成功,不能忽视忽视隐含在该语言结构中的文化因素及其相关文化背景知识的教学。从
【班会背景】不可否认,中职生在行为习惯方面存在种种问题,对于课堂礼仪、升旗礼仪、文明就餐等,尚不甚清楚——或许以前初中或小学的教师早已讲过,但学生因为叛逆或别的原因
鲁布革水电站为混合式开发的水电站,采用风化料心墙堆石坝。最大坝高101.5m;发电引水隧洞内径8m,长9382m;地下厂房总装机容量60万kW;溢洪道布置在左岸坝肩,净宽30m,全长约510
以中亚热带马尾松林和苦槠林为对象,原位收集根际和非根际土壤、树木不同生态功能的根系,开展15℃、25℃、35℃和45℃恒温培养模拟试验,采用密闭气室碱液吸收法测定53d内CO2
葛洲坝水利枢纽是目前我国自行设计兴建的规模宏大的水利水电工程,它是长江干流主体工程——三峡水利枢纽的组成部分,三峡枢纽建成后担负着三峡水库反调节任务。工程将于1988