论文部分内容阅读
通过嫩江干流中游设计洪、枯水及劳动湖综合治理工程控制区域设计洪水的分析计算 ,推求出综合治理工程控制区域的设计排水与设计引水 ,为劳动湖综合治理工程设计施工提供了依据
Through the analysis and design of the design flood of the control flood in the middle reaches of the Nenjiang River, the low water and the comprehensive control project of labor lake, it is deduced that the design drainage and design diversion in the comprehensive control engineering control area provide the basis for the design and construction of the comprehensive management of labor lake