多层吊盘的盘与立柱连接方法的改进

来源 :建井技术 | 被引量 : 0次 | 上传用户:scenery747
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
随着建井技术的不断发展,在凿井中越来越多的使用多层吊盘和大抓岩机。这样,吊盘的结构钢梁型号也不断加大。而连接上下层盘的立柱与盘的连接方法,仍按《煤矿凿井图册》中的螺栓连接法连接,螺栓型号不好加大,每根立柱用6个M18螺栓,其连接点的强度显得弱。我处在王家营副井凿井期间所使用的双层吊盘,就是采用《煤矿凿井图册》中的螺栓连接方法(图1)。使用一 With the continuous development of well construction technology, more and more multi-layer hangers and big grabs are used in sinking wells. In this way, the structural steel girder models also continue to increase. The connection between the upper and lower plate column and disk connection method, still according to “mine shaft sink atlas” in the bolt connection method, the bolt model is not good to increase, each column with 6 M18 bolts, the connection point strength It looks weak. The double-deck crane that I used during the Wangjiaying auxiliary shaft sinking was the bolt connection method in the Atlas of Coal Mine Drilling (Figure 1). Use one
其他文献
大树硫铁矿选矿车间,日处理硫铁矿原矿400吨,1980年6月投产,用重选处理四工区矿石。五年来,共处理原矿30万吨,生产硫精矿10万吨,回收率达73%以上。在原矿含水、含泥增加,品位
随着煤炭工业现代化技术的不断发展,胶带运输机在煤矿生产过程中的地位日益提高,仅以平顶山一矿而言,胶带运输机就有90余部。据了解平顶山矿务局全局胶带运输机在用台数达43
在欧洲,广泛用注水法减小开采期间呼吸性粉尘的产生量。在美国,它的应用仅局限于波卡洪特斯3号煤层深部的几个刨煤机工作面。本文论述了后退式长壁工作面注水工艺及矿业局在
江西省有色金属工业分公司于1984年12月22~25日在赣州冶金化工厂召开了塑料导爆索、导爆管一半秒雷管两项产品鉴定会。出席会议的代表有来自全国的科研、设计、高等院校及厂
应《中国水利》杂志编辑部之约,现将有关天津治水的一些看法,草于下文,就教于有关专家和广大读者同志们。天津地处渤海之滨,海河流域下游,素有“九河下梢”之称。特定的地理
由煤矿发生的事故来看,煤矿安全问题多注重在通风瓦斯煤尘、顶板、火药放炮、机电和提升运输等5个方面。对于煤矿开采中的辐射安全问题,还尚未引起注意,石煤开采中的辐射安
水仓是矿井各开采水平不可缺少的巷道,其作用是将矿井涌水暂时汇集起来并予橙清,再经水泵排至地面。水仓的长度一般为400~600米,约占车场总工程量的20~30%,其断面通常采用单轨
为了生产接替与充分利用石膏资源,应城石膏矿进行了G_z-8膏组上行开采试验研究。1984年7月开始试采,1985年8月试采结束。试采区回采面积16146米~2,采出矿量27449吨,试采过程
靖西县锰矿是广西生产电池锰粉的主要基地之一。文章通过选矿厂流程查定数据与产品分析,指出了目前生产技术经济指标不好的主要原因:入选粒度过粗。设备处理能力与人选矿量不
重介质选矿在西华山钨矿曾几上几下,原因很多,有经济、磨损自控等问题。希望读者能发表自己的见解,参加讨论,为振兴钨业,提高经济效益,作出贡献。 Heavy medium beneficiati