高砂水电站计算机监控系统自2002年1月份投入运行以来系统运行基本稳定,由于上位机主机/操作员站运行年限已到,均已损坏且无法修复,因此,针对存在问题先行对上位机系统进行升级改造是必要的。本文简述了高砂水电站计算机监控系统上位机存在问题及改造要求,介绍了改造后监控系统的结构和设备配置,升级改造现场施工与调试,以及升级改造的体会等内容。
Since the computer monitoring system of Gaosha hydropower station put into operation in January 2002, its system operation has basically been stable. Since the operating life of the host computer / operator station has reached the end, it has been damaged and can not be repaired. Therefore, the host computer system is upgraded for the existing problems Transformation is necessary. This article briefly introduces the existing problems and reconstruction requirements of PC in the computer monitoring system of Gaosha Hydropower Station, introduces the structure and equipment configuration of the monitoring system after reconstruction, construction and commissioning of the upgrading and reconstruction site, and the experience of upgrading and reconstruction.