论文部分内容阅读
矿床开采前两年内,Noranda勘探队打了109个钻孔,进尺82635m(21112ft),耗资1000万美元以上,圈定矿石储量19Mt矿石金品位10.1g/t(或0.295oz/t)。值价近25亿美元(不包括矿体内所含的0.1%的辉钼矿)。
During the two years prior to the deposit mining, the Noranda team drilled 109 boreholes, measuring 82635m (21112ft), costing more than $ 10 million and delineating 19Mt ore grade 10.1g / t (or 0.295oz / t) ore reserves. The value of nearly 2.5 billion US dollars (not including 0.1% molybdenite contained in the ore body).