Mineable coal reserves in thick and extra-thick seams account for 44% of the total deposit in China. Fullymechanized top-coal caving technology is a new mining method of safe and efficient underground operations in extra-thick seams in China. The development of fullymechanized top-coal caving technology in China, which was successfully applied in Face 8105 in Tashan Coal Mine, Datong, Shanxi, China, is analyzed in this paper.Studies on movement pattern of top-coal and roof from fully-mechanized top caving face in 14–20 m extra-thick seams have been carried out. A series of key technologies were successfully developed, including strata control technology, equipment for high-efficient and high-recovery top caving operations, and safety guarantee technology for low gas occurrence and high gas emission. As a result, the fully-mechanized top-coal caving Face 8105, with large mining height in Tashan Coal Mine, has achieved a recovery rate of 88.9% and an average equipment operation rate of 92.1%. With coal production of 10.84 Mt in 2011,the demonstration project is a technology and equipment breakthrough for fully-mechanized top-coal caving face in extra-thick coal seams with large mining height. Mineble coal reserves in thick and extra-thick seams account for 44% of the total deposit in China. Fully developed top-coal caving technology is a new mining method of safe and efficient underground operations in extra-thick seams in China. The development of fullymechanized top-coal caving technology in China, which was successfully applied in Face 8105 in Tashan Coal Mine, Datong, Shanxi, China, is analyzed in this paper. Books on movement pattern of top-coal and roof from fully-mechanized top caving face in A series of key technologies were successfully developed, including strata control technology, equipment for high-efficient and high-recovery top caving operations, and safety guarantee technology for low gas occurrence and high As a result, the fully-mechanized top-coal caving Face 8105, with large mining height in Tashan Coal Mine, has achieved a recovery rate of 88.9% and an average equipment operation rate of 92.1%. With coal production of 10.84 Mt in 2011, the demonstration project is a technology and equipment breakthrough for fully-mechanized top-coal caving face in extra-thick coal seams with large mining height.
其他文献
这里要描述的是狭叶瓜多竹(Guadua angustifolia异名:Bambusagnadua)的一个新栽培变种。它产生于哥伦比亚,由T.Grieb先生带回欧洲。T.Grieb是竹子爱好者,也是竹类界知名人士
同志们: 首先,我代表交通部科学技术情报研究所热烈祝贺华东地区公路科技情报网建立十周年!祝贺这次四新成果交流会的召开!并向参加会议的公路界的老前辈、老 Comrades: Fi
今年以来,烟台第二汽车运输公司在完成了企业与国家第一层次的承包经营责任制后,又进一步解放思想,引入竞争机制,在基层单位大胆推行了内部招标承包经营机制。使企业增强了
2009年英语四级快速阅读是自2006年6月实行新四级考试以来新增加的内容,至今已经考过六次了。前三次考试的快速阅读题为判断和填空两种题型,最近三次考试的快速阅读题为选择
自从30年前美国FSC公司生产出世界第一只运算放大器(下文简称运放或OP)μA702以来,运放在模拟电子世界有着极其广泛的运用,对信号进行放大、比较、调制、解调、有源滤波和多
地下厂房洞室群施工是一项影响因素众多、关系复杂的系统工程,传统的施工组织与管理手段已经不能满足大型地下洞室群施工组织与管理的需要,最终会影响工程建设目标的实现。如
江西省日前提出,必须牢固树立防大汛、抗大灾思想,坚持防汛抗旱两手抓,紧紧围绕防汛保安全,抗旱保丰收,保障整个经济社会用水需求的大目标,从六个方面全力抓好今年的防汛抗
2010年5月17-19日,中国水利水电建设工程咨询公司在昆明组织召开了云南省红河大黑公水电站预可行性研究报告咨询会议。参加会议的有云南省能源局,红河州人民政府及发改委、移
小湾水电站“抗力体”工程,对一期回填混凝土按照设计要求内部预埋水管,通水冷却,实际施工在冷却83d后,混凝土内部温度仍未降到设计要求的温度。监理对混凝土冷却水管作了有