论文部分内容阅读
位于云南省澜沧江中游河段、装机容量150万千瓦的漫湾水电站是开发澜沧江水力资源的第一期工程。是“七五”计划的重点项目,也是国内在建水电站中装机容量第二的水电站。其坝高126米,为混凝土重力坝,坝后厂房。电站施工通过招标承包的方式,择优选择承包单位。电站建设的准备工程是1985年9月开工的,已于1987年12月胜利的实现了截流。这是水电部第十四工程局、水电部第三工程局、漫湾电站工程管理局、水
Located in the middle reaches of the Lancang River in Yunnan Province, Manwan Hydropower Station, with an installed capacity of 1.5 million kilowatts, is the first phase of developing the Lancang River’s water resources. It is the key project of the “Seventh Five-Year Plan” and also the second hydropower station with installed capacity in Jianshui Hydropower Station. The dam height of 126 meters, concrete gravity dam, dam plant. Construction of the power plant through bidding contracting method, the preferred choice of contractor. The preparation for the construction of the power plant started in September 1985 and the river closure was successfully won in December 1987. This is the Fourteenth Engineering Department Ministry of MEP, MEW Third Engineering Bureau, Manwan Power Station Engineering Authority, water