中国的风电产业在过去的10年经历了快速的发展。从2005年《可再生能源法》实施起,风电装机从100万千瓦的水平,连续5年翻番式增长,到2010年接近3000万千瓦,之后4年以年均1500万以上的速度增长,到2015年3月,并网装机突破了1亿千瓦。目前,超过8000万千瓦机组已经核准或者在建。与此同时,随着风电并网规模的扩大,2010年后风电的弃风问题日益显著。相对于风电的设计负荷率水平,风电
China’s wind power industry has experienced rapid growth in the past 10 years. Since the implementation of the Renewable Energy Law in 2005, the installed capacity of wind power has doubled from 5 million for the first time in a row to nearly 30 GW in 2010, and has grown at an average annual rate of over 15 million in the following four years In March 2015, the net installed capacity exceeded 100 million kilowatts. At present, more than 80 million kilowatts of units have been approved or under construction. In the meantime, with the expansion of wind power grid integration, the problem of abandonment of wind power has become increasingly prominent after 2010. Wind power is relative to the design loading rate of wind power