大山下大桥初步设计为8×30m预应力混凝土T梁,全长247.04m。该桥前后路基均为挖方段,最大挖深达32.63m。原设计有18.2万方弃土,需租用弃土场约31亩,修筑施工便道890m。为减少工程造价,加快施工进度、保证安全生产、避免社会资源的重复浪费,在对该段路基软基进行处理后,取消了大山下大桥,不但解决了该段弃方严重的问题,而且保护了周围环境及植被,避免了严重的水土流失及耕地占用。
Dashanxia Bridge was initially designed as an 8 × 30m prestressed concrete T beam with a total length of 247.04m. The roadbed before and after the bridge are digging section, the maximum dug up to 32.63m. The original design of 182,000 square spoil, to be rented spoil area of about 31 acres, construction 890m road construction. In order to reduce construction cost, speed up the construction progress, ensure safety in production and avoid repeated waste of social resources, after the treatment of subgrade of soft subgrade in this section, the Dashanxia Bridge was canceled, which not only solved the serious problems in this section of abandonment, but also protected The surrounding environment and vegetation, to avoid the serious soil erosion and occupation of cultivated land.