论文部分内容阅读
水布垭水电枢纽拟建于清江干流深切峡谷地段,重力是决定坝址区岩体稳定与否的关键因素。该文采用三维有限元数值模拟的方法,对坝区岩体在重力作用下的应力场和位移场进行研究,为工程建设和坝区岩质边坡稳定性评价提供了重要依据。
The Shuibuya Hydroelectric Project is intended to be built in the deep gorges of the Qingjiang River. Gravity is the key factor that determines the stability of the rock mass in the dam site. In this paper, the three-dimensional finite element numerical simulation method is used to study the stress field and displacement field of rock mass under gravity in dam area, which provides an important basis for engineering construction and the stability evaluation of rock slope in dam area.