论文部分内容阅读
本文介绍了高标号(C_(38)级)大体积(31800×17000×5000mm)砼设备基础施工中,重点控制砼温升,减少温度应力,防止裂缝所采取的技术措施和收到的实际效果。
This article describes the high-grade (C_ (38) class) large volume (31800 × 17000 × 5000mm) equipment foundation construction, the key to control the temperature rise, reduce temperature stress, prevent cracks taken by the technical measures and the actual effect received .