我矿用电是由偃师具陶花店35千伏变电站输送出10千伏农用线路供电,经矿区地面变电所降为400伏供井下使用。随着巷道的延深,采区范围逐渐扩大以及动力设备的增加,400伏电压下井远不能满足要求.为此拟定两种方案(1)将400伏升压为6000伏入井,然后再降为400伏使用;(2)采用10千伏电压直接入井。我们开始了第二种方案的试验。为适应10千伏电压直接入井,我们对600伏PB_1型高压防爆开关及180千伏安普通型变压器.均进行了改制。提高绝缘强度.并作了耐压试验。(表1)(表2)所列.线路采用ZLQ_2——10电力电缆。接头采用环氧树脂其耐压见表(3)所示。经过一年多来的实践,证明设备、线路运行均较正常,试验是成功的。
Mine electricity is Yanshi Taohua shop with 35,000 volts substation transmission of 10 kV farm line power supply, the ground by the mine substation down to 400 volts for underground use. With the deepening of the roadway, the gradual expansion of the mining area and the increase of power equipment, the 400-volt voltage could not meet the requirements far. To solve this problem, two schemes have been developed: (1) 400V is boosted to 6000V and then reduced to 400 V use; (2) 10 kV voltage directly into the well. We started the second scenario. In order to adapt to 10 kV voltage directly into the well, we have 600 V PB_1 high voltage explosion-proof switch and 180 KVA ordinary transformer. Improve the dielectric strength. And made pressure test. (Table 1) (Table 2). The line uses ZLQ_2--10 power cables. The epoxy pressure-sensitive connectors are shown in Table (3). After more than a year of practice, that equipment, circuit operation are more than normal, the test is successful.