在现行标准(n.6.11.5)中,建议用提升设备必须具备的生产力确定车组中的矿车数,最后用矿车挂钩强度进行校验。然而,在现行标准的提升参数计算方法中,这种计算并未列入(C197)。本文提出的方法,将排除这个缺点,并包含了现行标准所推荐的计算程序。设备计算小时生产能力(即矿车数)可按下式确定: 式中:n_(Baг.ч)——按矿车数计算的设备小时生产能力,车/小时; T_(pas)——设备昼夜工作时间,小时;
In the current standard (n.6.11.5), it is advisable to determine the number of barrels in a car by the productivity that must be provided to lift the car, and finally to verify it with the car hooking strength. However, this calculation is not included in the current standard method of calculating lift parameters (C197). The method proposed in this paper will eliminate this disadvantage and include the calculation procedures recommended by the current standards. The hourly production capacity of the equipment (ie, the number of cars) can be determined as follows: where: n_ (Baг.ч) - hour capacity of the equipment per car, car / hour; Day and night working hours, hours;