论文部分内容阅读
主要分析了在施工期影响三峡工程升船机及临时船闸高边坡稳定的因素,并介绍了对高边坡安全进行仪器监测,同时开展现场巡视检查的情况。
This paper mainly analyzes the factors affecting the stability of the high slope of the Three Gorges Project shiplocker and the temporary shiplock during the construction period and introduces the monitoring of the safety of the high slope and the on-site inspections.