我厂从1979年5月10日起,在303~#(2万千伏安)电炉上,用上海吴淞煤气厂特制的气煤焦作还原剂,进行冶炼75%硅铁降低电耗试验。五月十日,用气煤焦代替冶金焦做还原剂试验开始以后,炉况明显恶化,电极逐日上抬;电极周围锥体炉料结成硬壳,气体集中在电极周围,从一处或几处喷出,塌料频繁;大面料烧死;炉口温度升高,烫得工人无法操作,半环中的水烧成高压蒸汽。试验到第五、六两天时,由于炉底温度降低,出现出铁困难。产量由四月份的44.554吨/日降到40吨/日左右,电耗升到9341度/吨,破今年最高纪录。此时为试验第一阶段。五月十七日,根据厂物理俭验结果得知:造成第一阶段情况的主要原因是气煤焦
I plant from May 10, 1979 onwards, 303 ~ # (20,000,000 VA) electric furnace, Shanghai Wusong gas plant with a special coal-fired coke as reductant, smelting 75% ferrosilicon to reduce power consumption test. On May 10, after gasification of coal coke instead of metallurgical coke was used as the reductant test, the furnace condition deteriorated significantly and the electrode was lifted day by day. Cone charge around the electrodes formed a hard shell and the gas was concentrated around the electrodes. Department discharge, frequent collapse of material; large fabric burned; furnace mouth temperature, hot workers can not operate, semi-loop water into high pressure steam. Test to the fifth, six two days, due to lower furnace temperature, the emergence of iron difficulties. The output dropped from 44.554 tons / day in April to 40 tons / day, and the electricity consumption rose to 9341 degrees / ton, breaking the highest record for this year. This is the first phase of the experiment. On May 17, according to the results of the plant physical tests, the main reason for the first phase of the situation was that the gas-fired coke