论文部分内容阅读
天生桥二级水电站引水隧洞施工中遇见多种恶劣地质现象,在施工中探索出一套行之有效的处理模式。同时对施工组织设计和施工过程进行了分析总结,并探讨了提高隧洞设计和施工水平的途径和措施。
Tianshengqiao Ⅱ hydropower station diversion tunnel construction encountered a variety of adverse geological phenomena in the construction to explore a set of effective treatment mode. At the same time, the construction organization design and construction process are analyzed and summarized, and the ways and measures to improve the tunnel design and construction level are discussed.