论文部分内容阅读
1 基本概况 白沙口防潮堤工程位于乳山市白沙口港湾处,堤防设计标准20年一遇。堤坝总长1.6km,宽8m,高5.28m,坝体结构为混合结构。该堤是全省唯一采用海砂做堤身填筑材料的Ⅲ级堤防工程。
1 Basic profile Baishakou flood barrier project is located in Rushan Baishakou Bay Department, dike design standards once in 20 years. The dam has a total length of 1.6km, a width of 8m and a height of 5.28m. The dam structure is a hybrid structure. The embankment is the only grade III embankment project in the province that uses sea sand for embankment materials.