论文部分内容阅读
河池绝大部份地区位于云贵高原前缘的斜坡地带上,水力资源藏量十分丰富。据统计,仅小水电蕴截量为87万千瓦,可供开发的55万千瓦(不包括红水河)。目前已开发的15.15万千瓦,占可开发量27.5%,其中包括自治区开发的拔贡、六甲、拉浪、洛东共12.35万千瓦,河池地区自己开发的才2.8万千瓦,占已开发量的18%,占可开发量的5%,还大有潜力。如能把这些资源开发利用起来,可以预见河池山区未来的繁荣景象。但是,这些河段绝大多数贯穿于岩溶峰丛地区,水文地质条件十分复杂,给水电建设带来一定的困难。但是只要对岩溶地质认真调查,掌握其发育特征,坝址选择得当,
Most of Hechi is located on the slope of the front edge of Yunnan-Guizhou Plateau, with abundant water resources. According to statistics, only a small hydropower reserves of 870,000 kilowatts, for the development of 550,000 kilowatts (excluding Hongshuihe). Has developed 151500 kilowatts, accounting for 27.5% of development, including the development of the autonomous region of Bagong, Rokko, pull waves, Luodong a total of 123,500 kilowatts, Hechi region developed only 28,000 kilowatts, accounting for the amount of development 18%, accounting for 5% of the amount of development, but also great potential. If these resources can be exploited and developed, we can foresee the future prosperity of Hechi Mountain Area. However, the vast majority of these sections run through the karst peaks and the hydrogeological conditions are very complicated, which brings some difficulties to the hydropower construction. However, as long as the karst geological survey, to grasp its developmental characteristics, dam site selection properly,