2015年是网、省公司中长期发展战略第二阶段的最后一年,作为云南电网公司实施电网建设的骨干力量,云南省送变电工程公司201 5年将着力提升精益化管理水平,争创优质、精品工程,以优异的基建工程质量助力电网建设,为全面创先提供硬件支撑。做好系统策划实施集成管理201 5年,送变电公司的电网建设任务呈现“点多面广战线长”的鲜明特点:在建项目达到49个,18个工程亟待开工,创历史新高,几乎每个施工项目都面临人员少、时间紧、任务重的局面。如果没有通盘考虑问题的
2015 is the last year of the second and mid-to-long term development strategy for the provincial and branch companies. As the backbone of the power grid construction implemented by Yunnan Power Grid Corporation, Yunnan Power Transmission and Transformation Engineering Company will strive to improve the lean management level and strive for High-quality, quality engineering, with excellent quality of infrastructure projects to help power grid construction, to create a comprehensive first hardware support. Good system planning and implementation of integrated management 201 5 years, send power transmission company’s power grid construction tasks show “a wide range of front-line length ” distinctive features: under construction projects reached 49, 18 projects urgently started, a record high, Almost every construction project faces fewer personnel, less time and heavier tasks. If there is no overall consideration of the problem