为防患于未然,常州市建委提出了“统一规划、分步实施;统筹安排、突出重点;立足防汛、兼顾环境;条块结合、分工负责”的防汛工作指导原则。结合现状,提出防汛三大目标:1.完成市内龙游河、东市河一期整治和横塘浜污水截流工程;2.通过建泵设闸和河道整治,完成城内6片区的防洪排涝系统工程;3.调整地下雨污水管网和实施旧城改造,消除7个低洼区
In order to prevent problems, the Changzhou Construction Committee proposed the principle of “unified planning, step-by-step implementation, overall planning, highlighting the key points; basing on flood prevention, taking into account the environment, combining blocks and division of labor”. Combine the status quo and propose three major goals for flood prevention: 1. Complete the city’s Longyou River, Dongshihe River First Stage Treatment, and Hengtang River sewage interception project; 2. Complete the pumping gates and river course improvement to complete flood prevention and drainage in the six districts within the city. System Engineering; 3. Adjustment of underground rain and sewage pipe network and implementation of old city transformation to eliminate 7 low-lying areas