论文部分内容阅读
张建永是从施工员成长为技术科长、项目经理、分公司经理的,他有很强的实践经验和理论知识。为满足实际施工要求,他对许多项目部位进行深化设计,先后做出泵房深化设计图、配电房深化设计图、气体灭火深化设计图、综合管廊布置图等一批深化图纸,为工程的顺利进行打下坚实的基础。张建永时刻按照质量过程控制程序要求技术人员必须做到“事前有交底、事中有检查、事后有复核”的质量控制理念,不放过任何细微的质量问题及质量隐患。为确保工程如期交工,在施工过程中,他及时与总承
Zhang Jian Yong from the construction workers to grow as technical section chief, project manager, branch manager, he has strong practical experience and theoretical knowledge. In order to meet the actual construction requirements, he deepened the design of many project sites and successively made a series of deepening drawings such as the deepening design of pump room, the deepening design of power distribution room, the deepening design of gas fire extinguishing and the layout of integrated pipe gallery, The smooth progress laid a solid foundation. Zhang Jian Yong always in accordance with the requirements of the quality process control procedures technical staff must be “in advance there is a check, things are checked, review afterwards ” quality control philosophy, not miss any subtle quality problems and quality problems. In order to ensure the project on schedule delivery, in the construction process, he timely and general commitment