论文部分内容阅读
SS_3型电力机车经过鉴定性试验及机车运行考核后,于一九八二年由铁道部科技局、机务局、工业总局、计统局主持进行了技术鉴定。鉴定时对该型机车提出了九条主要改进意见。据此,于一九八三年进行了机车样车的改造、完善工作,并于同年七月赴北京环行道作有关试验,一九八四年二月六日至三月三十一日进行了牵引性能补充试验。此外,一九八三年完成了SS_3002、SS_3003两台机车的扩大试制,又于八四年生产了SS_3004~SS_3006三台机车,从一九八五年起小批生产15台,一九八六年小批生产21台(其中SS_3022机车为单边传动机车),今年批量生产30台。在SS_3型电力机车技术鉴定后制造的这
SS_3 electric locomotive after a qualitative test and locomotive operation assessment, in 1982 by the Ministry of Science and Technology, Railway Bureau, Bureau of Industry, Bureau of Statistics presided over the technical appraisal. Identification of the locomotive made nine major improvements. Accordingly, a prototype car was remodeled and perfected in 1983 and was tested in the Beijing Circular Road in July of the same year for testing from February 6 to March 31, 1984 Traction Performance Supplementary Test. In addition, two pilot locomotives SS_3002 and SS_3003 were completed and piloted in 1983. In addition, three locomotives SS_3004 ~ SS_3006 were produced in 1984, 15 small-batch production vehicles from 1985, and 1986 In small batch production of 21 units (of which SS_3022 locomotives for unilateral transmission locomotive), mass production of 30 units this year. This SS_3 electric locomotive made after the technical identification of this