在幕墙工程施工过程中,由于合同中标工期一般要求时间较短,而主材供货周期又相对较长,如果资金供应不太充足,往往会使工期滞后,为了赶工期往往会形成一种边优化图纸边购料边施工的局面。在这种情况下,要做好较准确的工程成本预算就会困难重重,稍有不慎就会造成成本失控的局面。如果根据不同的施工方案,用CAD制作成本进度事前控制曲线图,用它进行成本进度分析控制、进行投资决策分析、进行施工方案的选择,就可以做到,简单、直观、
In curtain wall construction process, due to the general requirements of the contract the shorter the duration of the project, and the main material supply cycle is relatively long, if the funding is not sufficient, often lead to delays in the construction period, in order to catch the construction period is often a kind of edge Optimize the side of the drawings while buying materials construction situation. In this case, to make a more accurate budget for the cost of the project will be difficult, a slight mistake will result in cost out of control. If according to different construction programs, using CAD production cost schedule control curve in advance, using it for cost analysis of progress control, investment decision analysis, construction options, you can do it simple, intuitive,