合浦县武利江水轮泵站于1971年2月初步建成,安装水轮泵9台(其中60—6型的8台,100—8型的1台,用于发电的2台共101千瓦。泵站集雨面积1,220公里~2,河流平均流量14米~3/秒,最枯流量4米~3/秒。大坝长90米,高5.58米,实际水头2.58米,平均扬程10米(左右两岸分高、低渠道共4条)。设计出水量1.34米~3/秒,设计灌溉面积10,700亩,实际灌溉面积10,100亩。投入运行十年来,由于建立了管理机构和岗位责任制,管理较好,效益显著。该站不管体制
Hepu County Wulijiang Water Pump Station was initially completed in February 1971, with 9 hydro-pumps installed (of which 8 are 60-6, 1 is 100-8, and 101 kW are used for power generation) The station has a catchment area of 1,220 km ~ 2, with an average flow of 14 to 3 per second and a maximum flow rate of 4 to 3 per second. The dam is 90 meters long and 5.58 meters high. The actual head is 2.58 meters and the average lift is about 10 meters The design of the water area is 1.34m ~ 3 / s, the designed irrigation area is 10,700 mu and the actual irrigated area is 10,100 mu. Since it was put into operation for ten years, due to the establishment of the management institution and the post responsibility system, Good, effective. The station regardless of system