论文部分内容阅读
在环境恶劣的海区,利用半潜式钻探平台作为监测平台来收集近海油汽开发所需的海洋水文气象资料,是一种廉价而实用的方法。“白令海多陆架区战略试验井计划”便是其中最好的一个例子。该项计划由阿拉斯加ARCO油气公司负责,由EG&G公司提供完整的海洋水文气象监测系统,利用Sedco708号半潜式平台作为监测平台。测量仪器装在Sedco708平台和两条锚链系统上。气象仪器包括气压传感器和气温传感器。测得
In the harsh environment of the sea, the use of semi-submersible drilling platform as a monitoring platform to collect offshore hydrological meteorological data needed for the development of offshore oil and gas, is an inexpensive and practical method. One of the best examples is the Bering Strait Multilateral Trial Well Test Project. The project is managed by Alaska ARCO Oil and Gas Company, with EG & G providing a complete marine hydrometeorological monitoring system utilizing the Sedco No. 68 semi-submersible platform as a monitoring platform. The measuring instruments are mounted on the Sedco 708 platform and on two chain systems. Meteorological instruments include pressure sensors and temperature sensors. Measured