论文部分内容阅读
本文全面介绍了漫湾电站~#5机组的基本运行情况;阐述了漫湾电站~#5机组低水头稳定性现场实测所依据的标准规范,实测原理和所采取的基本实测方法,对实测结果进行了详细分析。
This paper introduces the basic operation of ~ # 5 unit of Manwan Hydropower Station in an all-round way, elaborates the standards, the principle of measurement and the basic measurement methods based on the low-head stability of Manwan Hydropower Station ~ # 5 unit. Based on the measured results Conducted a detailed analysis.