国际工程承包活动是一项风险较大的具有工程性质的商务活动,其合同价格随工程的进展而变化,尤其对于工期较长的国际工程项目,物价波动风险显得更为突出。通过刚果(金)RN1-LOT5标项目调差分析,介绍了国际工程公路项目的调差方法、方式,为从事国际公路工程项目调差,提供借鉴。
International project contracting activity is a risky engineering activity with the contract price changing with the progress of the project, especially for the international engineering projects with longer construction period, the price fluctuation risk becomes more prominent. Based on the adjustment analysis of the project of RN1-LOT5 in the DRC, the methods and methods of transfer of international engineering highway projects are introduced, which can be used as a reference for the adjustment of international highway projects.