论文部分内容阅读
青岛经济技术开发区于1984年10月20日经国务院批准,1985年3月28日开工建设。总体规划建设面积为15平方公里。开发区规划布局采用南北两个组团的布置形式。两个组团之间以自然山头绿地分隔,以宽畅通达的干道相连接。第一期先开发北组团。开发区建设计划分三步走:即三年起步,五年建设,八年全面发展,到本世纪末建成人口规模为10万人,工业
Qingdao Economic and Technological Development Zone was approved by the State Council on October 20, 1984 and started construction on March 28, 1985. The overall planning and construction area of 15 square kilometers. The planning and layout of the development zone adopts the arrangement of two groups of north and south. The two groups are separated by natural hillsides and connected with wide and accessible arterial roads. The first phase of North Development Group. The development zone construction plan is divided into three steps: starting in three years, five years of construction and eight years of all-round development. By the end of this century, the population scale will be 100,000 and the industrial